BARCLAYS CAPITAL

CONSOLIDATION IN PRAGUE 4

IBA carried out design, permitting and site duties for a 3 phased fit out totalling 3 500 m2 in the Gemini and Polygon buildings in Prague 4. The first phase totalled 1 200 m2 and IBA collaborated with International Architect’s Swanke Hayden Connell. The design followed Barclays corporate workplace design guidelines.

PROJECT DETAILS
CLIENT Barclays Capital
YEAR 2008-2009
SIZE 3 500 sqm